Construction of new A380 dock at Frankfurt Airport, Germany

For servicing the new A380 Airbus, Lufthansa Technik AG is planning to build a dock at Frankfurt Airport. For provision of its internal infrastructure, FICHTNER BAUCONSULTING (FBC) was entrusted with planning the apron of area 74,000 m², including a 400 Hz electricity supply for three parking bays as well as other outdoor facilities with roads, laydown areas and car parks, totaling 30,000 m², to include lighting. Additionally, central services supply and disposal networks for: rainwater (in three subnetworks), sanitary wastewater, drinking and service water, group heating and cable conduits as well as the control building of area 460 m² together with gate/barrier systems and perimeter fencing for the entire compound were planned. On the basis of the officially approved plans, FBC was responsible for: overall planning, general project management, site supervision and project oversight for the apron, outdoor facilities, central services supply and waste disposal facilities, as well as the central control location.

 

Fasanenhof link to Stuttgart rapid light urban rail system, Germany

For linking the district of Fasanenhof to the network of the rapid light urban rail system operated by Stuttgarter Strassenbahnen, a 1400 m tunnel with ramps is needed. Foreseen are three stations. Extensive re-laying of utility service lines is necessary. Following completion of the tunnel, roads and paths must be reinstated. Fichtner Bauconsulting’s services are determination of basic data and constraints, pre-project planning, conceptual engineering, drawing up an application for funding under German legislation for supporting communal transportation systems, and drawing up plan approval documents.

 

Stuttgart 21 Project – remodeling of Stuttgart rail junction, Germany

The urban renewal project “Stuttgart 21” concerns remodeling of the rail junction at Stuttgart as well as the district of Stuttgart-Wendlingen (with airport link) along the Stuttgart-Augsburg rail line, that is to be upgraded and rebuilt. Fichtner Bauconsulting’s tasks are routing the tunnel to Stuttgart Main Station and to Untertürkheim and Obertürkheim as well as planning all civil structures of this section in the area of Bad Cannstatt Maintenance Station. Additionally covered are planning of surface structures at the maintenance station, in particular administration and operating blocks, as well as maintenance and multi-purpose workshops together with facilities for cleaning trains outside and in.

 

Planning GSM-R sites along Frankfurt-Göttingen rail section 3600, Germany

Deutsche Bahn AG is currently using various analog wireless systems for its operational applications, and these no longer meet the growing needs of a modern rail network, so DB Telematik GmbH was commissioned with setting up a uniform digital wireless system on the basis of the GSM standard. The basic elements of the GSM infrastructure are base transceiver stations, installed to guarantee coverage of the overwhelmingly linear wireless transmission paths along the rail sections concerned. Fichtner Bauconsulting was awarded a contract for planning six new mast locations and replanning two existing ones.

 

Examples of projects in the Airports field of  activity:

Palanga Civil Airport, Lithuania

General planning for extending and widening takeoff and landing runways, for the new drainage system and the new Cat. II airport lighting system

 

Master planning for the civil airports Floriana/Hungary, Al-Hasakah and Ar’Raqqah/Syria, Libreville/Gabon, Palanga and Kaunas/Lithuania

 

Feasibility studies for airports at Bitburg, Brandenburg-Briest, Stendal/Germany and Podgorica/Montenegro

 

Preparation for and conducting the privatization procedure for Guayaquil Civil Airport/Ecuador as partner in an international consortium

 

Dresden Civil Airport, Germany

General planning and construction management for refurbishment of take-off and landing runways

 

New Berlin Brandenburg International Civil Airport, Germany

Review of airside elevation concept and definition of the basis for construction logistics

 

Frankfurt am Main Civil Airport

Application for planning permission under technical aspects for central utility services of the new runway and the major expansion on the south side

 

Frankfurt am Main Civil Airport

Application for planning permission under technical aspects for the plant for treating runoff water containing de-icing agents during winter operation

Frankfurt am Main Civil Airport

Application for planning permission under technical aspects for the central utility services of the new A380 handling area

 

Frankfurt am Main Civil Airport

General planning and supervision of site clearance and developing the new handling section for Condor Cargo Technik

 

Frankfurt-Hahn Civil Airport

General planning and site supervision for the new hard-surfaced security area of the take-off and landing runway

 

Frankfurt-Hahn Civil Airport

Application for planning permission under technical aspects for extending the take-off and landing runway system to 3800 m

 